McLennan Library /facilities/fr/taxonomy/term/300/all fr Construction start: McLennan Library – Convert 25kv distribution switches (English only) /facilities/fr/channels/news/construction-start-mclennan-library-convert-25kv-distribution-switches-english-only-357773 <p><em>(English only)</em></p> <p> </p> <p>Please be advised that ³ÉÈËVRÊÓƵ has mandated La Cie Électrique Britton Ltée to carry out the following project: 17-160 McLennan Library – Convert 25kv distribution switches.</p> <p><b>Description: </b>Project 17-160 aims to replace the 25 kV distribution switches located in the MB 32 room of the McLennan building on ³ÉÈËVRÊÓƵ's downtown campus. This equipment is critical for ensuring reliable electrical power supply to the McLennan Library, Bronfman, Armstrong, and Redpath Library buildings.</p> Thu, 20 Jun 2024 17:24:06 +0000 roberta.grimmtrotta@mcgill.ca 1744 at /facilities