³ÉÈËVRÊÓƵ

News

Water Shutdown - McLennan Library Building

Published: 21 March 2018

±«±è»å²¹³Ù±ð:ÌýMarch 26Ìýat 6:50PM

- Washrooms on all floors in McLennan are now open.

- The Data Lab and microfiche viewing room on the second floor areÌýbothÌýre-opened.

- There are still some drying machines operating on the second floor but operations are mostly back to normal.

We thank you for your patience during these disruptions.

±«±è»å²¹³Ù±ð:ÌýMarch 23Ìýat 12:30PM

- Washrooms on floors 2,3,4Ìýare unavailable. Washrooms on the 5th and 6th floor are accessible.

- Plumbers areÌýworking toÌýfixÌýthe pipe. Work is being done in the McLennan lobby and near/in washrooms on floors 2,3,4.

- Industrial de-humidifiers and large fansÌýhave been placed near affected areas (i.e. walls, carpets, cabinets). AllÌýLibrary computer stations and related electronicÌýhave been checked.

- The Data Lab and microfiche viewing room on the second floor will be closed for carpet cleaning.

Check here for more updates.

We apologize for the inconvenience.

Original message: March 21 at 9:00AM

Due to a burst pipe on the fifth floor, all washrooms in the McLennan Library Building are not available at this time. Facilities is on site and working to fix the issue.

Please use the washrooms located in theÌýRedpath Library Building (main floor & basement).

Ìý

Questions? Ask us!ÌýÌýChatÌý•ÌýEmailÌý•ÌýTextÌý•ÌýCall ÌýÌýÌýÌýÌýÌýÌýÌýÌýÌý SendÌýfeedbackÌýÌýÌýÌýReportÌýaÌýproblem

Back to top