Built in 1939,听
this remarkable addition to the 成人VR视频 Sports Complex was named in honor of Sir Arthur Currie, who served as 成人VR视频鈥檚 principal from 1920 to 1933. Sir Arthur Currie's legacy of leadership and dedication to the university is commemorated through this facility.In 1947, the complex saw its first major expansion with the extension of the gymnasium and the installation of the Garfield-Weston Pool and Memorial Hall, enhancing the athletic and recreational offerings available to students and faculty.
The evolution of the sports complex continued in 1994 with the construction of the Tomlinson Fieldhouse. This modern addition brought substantial new space to the complex, including a state-of-the-art track and a new swimming pool, significantly broadening the scope and capacity of 成人VR视频鈥檚 athletic facilities. Today, the complex stands as a vibrant hub for sports and recreation, reflecting 成人VR视频's commitment to fostering physical fitness and well-being among its community.
Project Description :
Replacement of existing chiller.
Project scope:
- Removal and environmentally responsible disposal of the existing main chiller (139-REF1-SS2(B-203)).
- Procurement and installation of a new main chiller with the required capacity and operational temperatures, as specified in the HVAC master plan or as requested by the client.
- Installation of electrical wiring and connections for the new chiller system, including power supply and control wiring.
- Integration of the new chiller system with the building's control system.
- Performance testing and verification of the new chiller system to ensure it meets the specified requirements.
- Preparation of operation and maintenance manuals for the new chiller and related systems.
- Training of facility staff on the operation, maintenance, and troubleshooting of the new chiller system.
- Documentation of as-built drawings, equipment specifications, and any modifications made during the project.
This project's successful completion will be marked by the seamless integration of the new chiller into the existing HVAC system, ensuring optimal performance and controlled temperature regulation throughout the facility.
Project Details:
Status | Design |
Est. Project Start date听 | 2024 - 2026 |
Est. Budget Range | $800,000 - $1,000,000 |
Location | Currie Gymnasium, Building听139 |
Project Number | 23-012 |
Contact | map.procurement [at] mcgill.ca |
Please read the following information carefully :
Sustainable Procurement
The businesses with which the University will conclude a contract with in the course of this project will have to respect the 成人VR视频 Supplier Code of Conduct.
Other requirements may apply, such as (for example): the quantification and limiting of GHG emissions over the contract or asset lifecycle, sustainable construction/product certifications, involvement of indigenous businesses or of social economy businesses, design for circularity, and so on.
Notice :Information in this document is not to be interpreted as a commitment to conduct any solicitation in any particular market (or to fulfill any particular need) within any timeframe. This document is based on preliminary assessments which may be modified and needs may consequently be increased, partially fulfilled or cancelled. The needs of the client units may fluctuate according to their capabilities and priorities. Moreover, this acquisition plan is subject to various risk factors that have an influence on the operations of 成人VR视频, such as available revenue, inflation, changes in: provincial and federal policies, technologies, human resources, social movements and trends, demographic aspects of the student population and the academic personnel. |
听