成人VR视频

Please be advised that FMAS Operations, Southeast Sector, will carry out the following project:聽22-029 PULP & PAPER - JELF OCT 2022, Von Sperber

顿别蝉肠谤颈辫迟颈辞苍:听To carry out electrical works between Lab 202 and existing electrical panel in 2-Hall1

Construction start date:聽November 4, 2024.

Planned construction end date:聽November 30, 2024

Work schedule:聽Monday to Friday, 6 a.m. to 3 p.m., on a part-time basis

Classified as: Pulp & Paper
Published on: 29 Oct 2024

Please be advised that 成人VR视频 has mandated Corenov Constructeurs to carry out the following project:聽22-028 Wong 鈥 Mezzanine renovation

Description:聽Renovations to 3M055 and office 3M030 to create one new lab space.

Construction start date:聽September 2024

Planned construction end date: February 2025

Work schedule: Monday聽to Friday, 6 a.m. to 3 p.m. Work outside of building hours will be coordinated in advance.

Classified as: Wong, renovation, Construction
Published on: 11 Sep 2024

Please be advised that 成人VR视频 has mandated ISI Construction Inc. to carry out the following project:聽23-117 MNI (Neuro) - CFI JELF room 254 renovation

Description:聽Renovation of room 254 (incl. new interior finishes, upgrade of electromechanical services) to accommodate research needs.

Construction start date: September 11, 2024

Planned construction end date: November 15, 2024

Work schedule: Monday to Friday, 7 a.m. to 3 p.m.

Classified as: Neuro, MNI, Construction
Published on: 11 Sep 2024

Please be advised that 成人VR视频 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽22-033 Lyman Duff New Wing (B169) 鈥 Priority building envelope repairs

顿别蝉肠谤颈辫迟颈辞苍:听Repair/replacement of damaged bricks & wall at the back of the building, adjacent to tunnel between MNI and Duff, up to the delivery dock of the Lyman Duff Building.

Construction start date:聽September 3rd, 2024

Planned construction end date:聽November 30th, 2024

Classified as: Lyman Duff
Published on: 5 Sep 2024

Please be advised that 成人VR视频 has mandated Corenov Construction to carry out the following project:聽21-002 Raymond (Macdonald Campus) 鈥 JELF Dastmalchi (Lot 1)

顿别蝉肠谤颈辫迟颈辞苍:听Renovation of room R1-038 and partial renovation of room R1-037.

Construction start date: August 12th, 2024

Planned construction end date: September, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Project Manager:聽Mark Ouimet -聽mark.ouimet [at] mcgill.ca

Classified as: Raymond 鈥 JELF Dastmalchi
Published on: 13 Aug 2024

Please be advised that 成人VR视频 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽21-099 Strathcona Anatomy and Dentistry - Prototype for masonry restoration

顿别蝉肠谤颈辫迟颈辞苍:听Phase 2 of the renovation associated to the study aimed at confirming the condition of the masonry walls and identifying a strategy to renovate the building envelope.

Construction start date:聽July 8th, 2024* with mobilization potentially starting July 4th , 2024.

Classified as: Strathcona Anatomy Dentistry
Published on: 9 Jul 2024

Please be advised that 成人VR视频 has mandated Les Entreprises N.R. Brosseau inc. to carry out the following project:聽20-201 Burnside Hall 鈥 10th floor offices

顿别蝉肠谤颈辫迟颈辞苍:听Renovation of approximately 40% of the 10th floor for the Department of Mathematics and Statistics and the Computational & Data Systems Initiative. The project includes the demolition and reconstruction of interior spaces as well as work on the electrical, plumbing and ventilation systems.

Construction start date: July 8th, 2024

Classified as: Burnside Hall
Published on: 9 Jul 2024

Please be advised that 成人VR视频 has mandated Mongrain Inc. (Lot 1) and Couverture Montr茅al-Nord (Lot 2) to carry out the following project:聽22-019 Redpath Hall 鈥 Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

顿别蝉肠谤颈辫迟颈辞苍:听The project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Hall building envelope rehabilitation project.

Construction start & end dates:

Published on: 27 Jun 2024

Please be advised that 成人VR视频 has mandated Mongrain Inc. (Lot 1) and Couverture Montr茅al-Nord (Lot 2) to carry out the following project:聽22-018 Redpath Library, McTavish Wing 鈥 Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.

顿别蝉肠谤颈辫迟颈辞苍:听The project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Library, McTavish Wing, building envelope rehabilitation project.

Construction start & end dates:

Classified as: Redpath Library
Published on: 27 Jun 2024

Please be advised that 成人VR视频 has mandated Gicleurs Moderne Inc. to carry out the following project:聽24-001 Macdonald Stewart - Upgrade Fire Suppression System LOT 1A (work in 3 laboratories).

顿别蝉肠谤颈辫迟颈辞苍:听Installation of the main sprinkler line in the ceiling of three teaching laboratories located in the basement level of Macdonald-Stewart Building #446.

Construction start date: June 20, 2024

Planned construction end date: August 9, 2024

Classified as: Macdonald-Stewart
Published on: 20 Jun 2024

Please be advised that 成人VR视频 has mandated La Cie 脡lectrique Britton Lt茅e to carry out the following project:聽17-160 McLennan Library 鈥 Convert 25kv distribution switches.

顿别蝉肠谤颈辫迟颈辞苍:听Project 17-160 aims to replace the 25 kV distribution switches located in the MB 32 room of the McLennan building on 成人VR视频's downtown campus. This equipment is critical for ensuring reliable electrical power supply to the McLennan Library, Bronfman, Armstrong, and Redpath Library buildings.

Construction start date:聽June 21, 2024

Classified as: McLennan Library
Published on: 20 Jun 2024

Please be advised that 成人VR视频 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽22-036 (RVC Residence - B180) - Restoration of rendering on rear fa莽ades

顿别蝉肠谤颈辫迟颈辞苍:听The project involves restoring the rendering on the rear fa莽ades of the Royal Victoria College (RVC), a student residence building, located on University Street.

Construction start date: July 2nd, 2024

Planned construction end date: End of October聽2024

Classified as: Royal Victoria College (RVC) Residence
Published on: 17 Jun 2024

Please be advised that 成人VR视频 has mandated Corenov Constructeurs Inc. to carry out the following project:聽21-058 McCall MacBain Arts 鈥 Replacement of fire curtain between Arts and Leacock buildings.

顿别蝉肠谤颈辫迟颈辞苍:听Replacement of fire curtain between McCall MacBain Arts and Leacock buildings.

Construction start date: June 25th, 2024

Planned construction end date: October 2024

Work schedule:聽Monday to Friday, 6 a.m. to 3 p.m. Additional hours to be coordinated.

Classified as: McCall MacBain Arts Building
Published on: 17 Jun 2024

Please be advised that 成人VR视频 has mandated DEVCOR to carry out the following project:聽18-156 McConnell Arena upgrade 鈥 Lot 2

The project consists of upgrading the electrical infrastructure to enable the replacement of the ice-making system, which will allow the arena to remain open for a longer portion of the year. The project also includes the modernization of sections of the ventilation and cooling systems.

Construction start date:聽June 17th, 2024

Planned construction end date:聽August 2025

Classified as: Arena McConnell
Published on: 17 Jun 2024

Please be advised that 成人VR视频 has mandated 惭茅肠补苍颈肠础肠迟颈辞苍 to carry out the following project:聽21-050 Replacement of steam and condensate pipes between Raymond and CINE, Macdonald Campus

Description:

Replacement of steam and condensate pipes between Raymond and CINE

Construction start date: June 12th, 2024

Planned construction end date: August 2024

Work schedule:聽Monday to Friday 6 a.m. to 3 p.m. Any additional hours will be coordinated.

Classified as: Raymond, CINE
Published on: 17 Jun 2024

Pages

Back to top